All Issue

2019 Vol.10, Issue 3 Preview Page

General Article

30 September 2019. pp. 136-146
Abstract
References
1
H. Cho, H. Lim, D. Lee, H. Cho, and K. Kang, Patent analysis for forecasting promising technology in high-rise building construction, Technological Forecasting and Social Change. 128, pp. 144-153.
10.1016/j.techfore.2017.11.012
2
D. Lee, H. Lim, T. Kim, H. Cho, and K. Kang, Advanced planning model of formwork layout for productivity improvement in high-rise building construction, Automation in Construction. 85(2018), pp. 232-240.
10.1016/j.autcon.2017.09.019
3
Korea super tall building forum, Super tall building design and technology, Kimoondang. (2007).
4
S. Kim, Risk Analysis of High-rise Construction Using PROMETHEE, M.S. Thesis, Pukyong National University. (2013).
5
S. Kim, S. Kim, and J. Yang, Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project. Korea Journal of Construction Engineering and Management. 17(2) (2016), pp. 90-98.
10.6106/KJCEM.2016.17.2.090
6
K. Park, H. Lee, and C. Kim, Assessment of Risk Management Practices of CM Enterprise: The Need for an Enterprise-level Risk Management Framework, Korea Institute of Construction Engineering and Management. 15(3) (2014), 66-73.
10.6106/KJCEM.2014.15.3.066
7
Korea Institute of Construction Engineering and Management, Contract/Claim/Risk Management, CIR. (2019).
8
Y. Jeon, Risk Reduction Strategies by Considering Financial Feasibility for High-Rise Development Project, Ph.D. Thesis, Konkuk University. (2018).
9
M. Jang, Y. Yoon, and S. Suh, Method of Schedule Risk Management using a Project Management Program, Architectural Institute of Korea. 22(12) (2006), pp. 131-138.
10
J. Lee, Y. Song, Y. Kim, M. Lee, Y. Ji, W. Lee, and Y. Kim, Development of the Model for the Subject-oriented Management in Super Tall Building Construction Project. Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities and Sociology. 6(1) (2016), pp. 419-430.
10.14257/AJMAHS.2016.01.11
11
P. Fewings and C. Henjewele, Construction Project Management: An Integrated Approach, 3rd Ed., Taylor & Francis. (2019).
10.1201/9781351122030
12
The Korea Institute of Building Construction, Building Construction Management, The Korea Institute of Building Construction. (2015).
13
Y. Yoon, S. Suh, M. Park, and M. Jang, Construction Process based Schedule Risk Management System, Korea Institute of Construction Engineering and Management. 9(4) (2008), pp. 101-110.
14
Project Management Institute (PMI). A Guide to the Project Management Body of Knowledge, 5th Ed., PMI. (2013).
15
O. Cretu, R. Stewart, and T. Berends, Risk Management for Design and Construction, John Wiley & Sons. (2011).
10.1002/9781118984017
16
M. Kim, Management and Organization of the Building Construction, Kimoondang. (2006).
17
J. Lee, M. Lee, Y. Kim, Y. Song, Y. Ji, Development of the Prototype for the Subject-oriented Management in Mega-Building Construction Project. Convergence Research Letter. 1(3) (2015), pp. 709-713.
Information
  • Publisher :Sustainable Building Research Center (ERC) Innovative Durable Building and Infrastructure Research Center
  • Publisher(Ko) :건설구조물 내구성혁신 연구센터
  • Journal Title :International Journal of Sustainable Building Technology and Urban Development
  • Volume : 10
  • No :3
  • Pages :136-146
  • Received Date : 2019-08-26
  • Accepted Date : 2019-09-30
Journal Informaiton International Journal of Sustainable Building Technology and Urban Development International Journal of Sustainable Building Technology and Urban Development
  • scopus
  • NRF
  • KOFST
  • KISTI Current Status
  • KISTI Cited-by
  • crosscheck
  • orcid
  • open access
  • ccl
Journal Informaiton Journal Informaiton - close