31 December 2021. pp. 394-409
Abstract
References
1
G. Ma, A. Wang, N. Li, L. Gu, and Q. Ai, Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12) (2014), pp. 04014055. 10.1061/(ASCE)CO.1943-7862.0000908
2
L.D. Long and A. Ohsato, Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management. 26(6) (2008), pp. 688-698. 10.1016/j.ijproman.2007.09.012
3
D. Zhong, L. Bi, J. Yu, and M. Zhao, Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method. Science China Technological Sciences. 59(2) (2016), pp. 252-264. 10.1007/s11431-015-5859-3
4
S.M. Huang, I.C. Chang, S.H. Li, and M.T. Lin, Assessing risk in ERP projects: identify and prioritize the factors. Industrial management & data systems. (2004). 10.1108/02635570410561672
5
V. Khodakarami, N. Fenton, and M. Neil, Project Scheduling: Improved approach to incorporate uncertainty using Bayesian Networks. Project Management Journal. 38(2) (2007), pp. 39-49. 10.1177/875697280703800205
6
M. Park and F. Peña-Mora, Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5) (2004), pp. 626-637. 10.1061/(ASCE)0733-9364(2004)130:5(626)
7
V. Ahuja and V. Thiruvengadam, Project scheduling and monitoring: current research status. Construction Innovation. (2004). 10.1108/14714170410814980
8
G. Ma, L. Gu, and N. Li, Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management. 141(10) (2015), pp. 04015030. 10.1061/(ASCE)CO.1943-7862.0001003
9
H. Aytug, M.A. Lawley, K. McKay, S. Mohan, and R. Uzsoy, Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research. 161(1) (2005), pp. 86-110. 10.1016/j.ejor.2003.08.027
10
I. Cohen, A. Mandelbaum, and A. Shtub, Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives. Project Management Journal. 35 (2004), pp. 39-49. 10.1177/875697280403500206
11
Y. Shou and K.T. Yao, Estimation of project buffers in critical chain project management. In Management of Innovation and Technology, 2000. ICMIT 2000. Proceedings of the 2000 IEEE International Conference on (Vol. 1, pp. 162-167). IEEE.
12
R.C. Newbold, Project management in the fast lane: applying the theory of constraints. 1998, CRC Press.
13
H. Steyn, An investigation into the fundamentals of critical chain project scheduling. International journal of project management, 19(6) (2001), pp. 363-369. 10.1016/S0263-7863(00)00026-0
14
W. Herroelen and R. Leus, On the merits and pitfalls of critical chain scheduling. Journal of operations management. 19(5) (2001), pp. 559-577. 10.1016/S0272-6963(01)00054-7
15
C. Artigues, R. Leus, and F.T. Nobibon, Robust optimization for resource-constrained project scheduling with uncertain activity durations. Flexible Services and Manufacturing Journal. 25(1) (2013), pp. 175-205. 10.1007/s10696-012-9147-2
16
J.B. Yang, How the critical chain scheduling method is working for construction. Cost engineering. 49(4) (2007), pp. 25-32.
17
T.G. Lechler, B. Ronen, and E.A. Stohr, Critical chain: A new project management paradigm or old wine in new bottles?. Engineering Management Journal. 17(4) (2005), pp. 45-58. 10.1080/10429247.2005.11431672
18
K. Araszkiewicz, Application of critical chain management in construction projects schedules in a multi-project environment: A case study. Procedia Engineering. 182 (2017), pp. 33-41. 10.1016/j.proeng.2017.03.108
19
O. Lambrechts, E. Demeulemeester, and W. Herroelen, Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. Journal of scheduling. 11(2) (2008), pp. 121-136. 10.1007/s10951-007-0021-0
20
W. Herroelen and R. Leus, Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research. 165(2) (2005), pp. 289-306. 10.1016/j.ejor.2004.04.002
21
S. Van de Vonder, E. Demeulemeester, R. Leus, and W. Herroelen, Proactive-reactive project scheduling trade-offs and procedures. In Perspectives in modern project scheduling. 2006, pp. 25-51. Springer, Boston, MA. 10.1007/978-0-387-33768-5_2
22
W. Herroelen, Generating robust project baseline schedules. In OR Tools and Applications: Glimpses of Future Technologies. INFORMS. (2007), pp. 124-144. 10.1287/educ.1073.0038
23
M. Ghaffari and M.W. Emsley, Current status and future potential of the research on Critical Chain Project Management. Surveys in Operations Research and Management Science. 20(2) (2015), pp. 43-54. 10.1016/j.sorms.2015.10.001
24
N.G. Hall, Further research opportunities in project management. 2015, In Handbook on Project Management and Scheduling, Vol. 2, pp. 945-970. Springer, Cham. 10.1007/978-3-319-05915-0_13
25
E. Roghanian, M. Alipour, and M. Rezaei, An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. International Journal of Construction Management. 18(1) (2018), pp. 1-13. 10.1080/15623599.2016.1225327
26
G.K. Rand, Critical chain: the theory of constraints applied to project management. International Journal of Project Management. 18(3) (2000), pp. 173-177. 10.1016/S0263-7863(99)00019-8
27
L. Yang, Y. Fu, S. Li, B. Huang, and T. Peng, A buffer sizing approach in critical chain scheduling with attributes dependent. In Wireless Communications, Networking and Mobile Computing, 2008. WiCOM'08. 4th International Conference, IEEE. (2008, October), pp. 1-4. 10.1109/WiCom.2008.1805
28
L.P. Leach, Critical chain project management. 2014, Artech House.
29
M.G. Eliyahu, Critical chain. MA: The North River Press. 1997, Publishing Corporation, Great Barrington.
30
M. Bevilacqua, F.E. Ciarapica, and G. Giacchetta, Critical chain and risk analysis applied to high-risk industry maintenance: A case study. Int. J. Proj. Manage., 27(4) (2009), pp. 419-432. 10.1016/j.ijproman.2008.06.006
31
A. Ślusarczyk and D. Kuchta, The new approach for the project activities classification and its application in the critical chain buffer management method. Studia Ekonomiczne. 137 (2013), pp. 141-162.
32
R. Stratton, Critical chain project management theory and practice. Journal of Project Management and Systems Engineering. 21(4) (2009), pp. 149-173.
33
N. Metropolis and S. Ulam, The monte carlo method. Journal of the American statistical association. 44(247) (1949), pp. 335-341. 10.1080/01621459.1949.1048331018139350
34
D.J. Mignon, S.J. Honkomp, and G.V. Reklaitis, A framework for investigating schedule robustness under uncertainty. Computers & Chemical Engineering. 19 (1995), pp. 615-620. 10.1016/0098-1354(95)87103-9
35
J. Colin and M. Vanhoucke, Developing a framework for statistical process control approaches in project management. International Journal of Project Management. 33(6) (2015), pp. 1289-1300. 10.1016/j.ijproman.2015.03.014
36
T. Raz, R. Barnes, and D. Dvir, A Critical Look at Critical Chain. Project Management Journal. (2003). 10.1177/875697280303400404
37
M. Gagnon, G.R. d'Avignon, and F.F. Boctor, A Local Search for the Resource-Constrained Project Scheduling Problem. 2003, Faculté des sciences de l'administration de l'Université Laval, Direction de la recherche.
Information
  • Publisher :Sustainable Building Research Center (ERC) Innovative Durable Building and Infrastructure Research Center
  • Publisher(Ko) :건설구조물 내구성혁신 연구센터
  • Journal Title :International Journal of Sustainable Building Technology and Urban Development
  • Volume : 12
  • No :4
  • Pages :394-409
  • Received Date : 2021-11-09
  • Accepted Date : 2021-12-07
Journal Informaiton International Journal of Sustainable Building Technology and Urban Development International Journal of Sustainable Building Technology and Urban Development
  • scopus
  • NRF
  • KOFST
  • KISTI Current Status
  • KISTI Cited-by
  • crosscheck
  • orcid
  • open access
  • ccl
Journal Informaiton Journal Informaiton - close