Abstract
References
UNEP, Sustainable Buildings and Climate Initiatives (2011). Available at: <http://www.unep.org/sbci/pdfs/sbci _2pager_eversion_Feb2011.pdf>. Last accessed 02.12.2015. L.B. Robichaud and V.S. Anantatmula, Greening project management practices for sustainable construction, Journal of Management in Engineering. 27(2011), pp. 48-57. BCA, 3rd Green Building Masterplan (2014). Available at: <http://www.bca.gov.sg/GreenMark/others/3rd_ Green_Building_Masterplan.pdf>. Last accessed 18.10.2014. BCA, 2nd Green Building Masterplan (2009). Available at: <http://www.bca.gov.sg/greenMark/others/gbmp2.pdf>. Last accessed 18.10.2014. B.G. Hwang and L.P. Leong, Comparison of schedule delay and causal factors between traditional and green construction projects, Technological and Economic Development of Economy. 19 (2013b), pp. 310-330. S. Mokhlesian and M. Holmén, Business model changes and green construction processes, Construction Management and Economics. 30 (2012), pp. 761-775. Environmental Protection Agency, Green Building Basic Information (2016). Available at: <http://www.epa. gov/greenbuilding/pubs/about.htm>. Last accessed 21.01.2016. L.N. Dwaikat and K.N. Ali, Green buildings cost premium: A review of empirical evidence, Energy and Buildings. 110 (2016), pp. 396-403. N. Singhaputtangkul, S.P. Low, A.L. Teo, and B.G. Hwang, Criteria for architects and engineers to achieve sustainability and buildability in building envelope designs, Journal of Management in Engineering. 30 (2014a), pp. 236-245. S. Mollaoglu-Korkmaz, L. Swarup, and D. Riley, Delivering sustainable, high-performance buildings: Influence of project delivery methods on integration and project outcomes, Journal of Management in Engineering. 29 (2013), pp. 71-78. BCA, Building Planning and Massing (2010). Available at: <https://www.bca.gov.sg/greenmark/others/ bldgplanningmassing.pdf>. Last accessed 21.01.2016. BCA, BCA Green Mark for New Non-Residential Buildings (2013). Available at: <http://www.bca.gov.sg/ greenmark/others/gm_nonresi_v4.1_rev.pdf>. Last accessed 18.10.2014. B.G. Hwang and J.S. Tan, Green building project management: Obstacles and solutions for sustainable development, Sustainable Development. 20 (2012), pp. 335-349. Department of Statistics Singapore, Labour Productivity by Industry (2014a). Available at: <https://www.mti.gov.sg/ ResearchRoom/SiteAssets/Pages/Economic-Survey-of-Singapore-Second-Quarter-2014/A2.2_2Q14.pdf>. Last accessed 04.04.2016. BCA, Construction Productivity Roadmap to chart transformation of the construction sector (2011). Available at: <http://www.bca.gov.sg/Newsroom/pr03032011_CP.html>. Last accessed 21.01.2016. BCA, The Second Construction Productivity Roadmap (2015b). Build Smart, Available at: <http://www.bca. gov.sg/emailsender/BuildSmart-062015/microsite/others/bca-newsletter.pdf>. Last accessed 21.01.2016. P. Wu and S.P. Low, Lean management and low carbon emissions in precast concrete factories in Singapore, Journal of Architectural Engineering. 18 (2012), pp. 176-186. R.L. Ott and M. Longnecker, An Introduction to Statistical Methods and Data Analysis, Brooks/Cole, Cengage Learning, Belmont, CA, USA (2010). B.G. Hwang, X. Zhao, Y.L. See, and Y. Zhong, Addressing Risks in Green Retrofit Projects: The Case of Singapore, Project Management Journal. 46 (2015), pp. 76-89. Y. Ke, S. Wang, A.P.C. Chan, and E. Cheung, Understanding the risks in China's PPP projects: Ranking of their probability and consequence, Engineering, Construction and Architectural Management. 18 (2011), pp. 481-496. B.-G. Hwang, L. Zhu, and J.T.T. Ming, Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore, Journal of Management in Engineering. (2016), pp. 04016052. P.X.W. Zou, G. Zhang, and J. Wang, Understanding the key risks in construction projects in China, International Journal of Project Management. 25 (2007), pp. 601-614. B.G. Hwang, M. Shan, and T.E.K., Investigating Reworks in Green Building Construction Projects: Magnitude, Influential Factors, and Solutions, International Journal of Environmental Research. (2016a), pp. 499-510. X. Zhang, L. Shen, and Y. Wu, Green strategy for gaining competitive advantage in housing development: A China study, Journal of Cleaner Production. 19 (2011), pp. 157-167. B.G. Hwang, S.R. Thomas, C.T. Haas, and C.H. Caldas, Measuring the impact of rework on construction cost performance, Journal of Construction Engineering and Management. 135 (2009), pp. 187-198. Y.A. Debrah and G. Ofori, Flexibility, labour subcontracting and HRM in the construction industry in Singapore: Can the system be refined?, International Journal of Human Resource Management. 8 (1997), pp. 690-709. P.M. Goodrum and C.T. Haas, Long-term impact of equipment technology on labor productivity in the U.S. construction industry at the activity level, Journal of Construction Engineering and Management. 130 (2004), pp. 124-133. E. Tagaza and J. Wilson, Green buildings: drivers and barriers e lessons learned from five Melbourne developments, Report Prepared for Building Commission by University of Melbourne and Business Outlook and Evaluation (2004). P.F. Kaming, P.O. Olomolaiye, G.D. Holt, and F.C. Harris, Factors influencing craftsmen's productivity in Indonesia, International Journal of Project Management. 15 (1997), pp. 21-30. P.O. Olomolaiye, K.A. Wahab, and D.F. Price, PROBLEMS INFLUENCING CRAFTSMEN'S PRODUCTIVITY IN NIGERIA, Building and Environment. 22 (1987), pp. 317-323.
Information
- Publisher :Sustainable Building Research Center (ERC) Innovative Durable Building and Infrastructure Research Center
- Publisher(Ko) :건설구조물 내구성혁신 연구센터
- Journal Title :International Journal of Sustainable Building Technology and Urban Development
- Volume : 8
- No :1
- Pages :45-53
- Received Date : 2017-01-16
- Accepted Date : 2017-01-18
- DOI :https://doi.org/10.12972/susb.20170004


International Journal of Sustainable Building Technology and Urban Development









