General Article
T.D. Oesterreich and F. Teuteberg, Understanding the implications of digitisation and automation in the context of Industry 4.0: A triangulation approach and elements of a research agenda for the construction industry. Computers in Industry. 83 (2016), pp. 121-139.
A. Karmakar and V.S.K. Delhi, Construction 4.0: what we know and where we are headed? Journal of Information Technology in Construction (ITcon). 26 (2021), pp. 526-545. DOI: 10.36680/j.itcon.2021.028.
10.36680/j.itcon.2021.028World Economic Forum, Shaping the Future of Construction: A Breakthrough in Mindset and Technology. 2016, World Economic Forum.
McKinsey Global Institute, Reinventing Construction: A Route to Higher Productivity. 2017, McKinsey Global Institute.
R.M. Lawson, R.G. Ogden, and C. Goodier, Design in Modular Construction. 2014, CRC Press.
10.1201/b16607I.Y. Wuni and G.Q. Shen, Critical success factors for modular integrated construction projects: A review. Building Research and Information. 48(7) (2020), pp. 763-784.
I.Y. Wuni and G.Q. Shen, Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies. Journal of Cleaner Production. 249 (2020), 119347.
10.1016/j.jclepro.2019.119347R. Jin, S. Gao, A. Cheshmehzangi, and E. Aboagye-Nimo, A holistic review of off-site construction literature published between 2008 and 2018. Journal of Cleaner Production. 202 (2018), pp. 1202-1219.
B.G. Hwang, M. Shan, and K.Y. Looi, Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production. 183 (2018), pp. 183-193.
10.1016/j.jclepro.2018.02.136Grand View Research, Modular Construction Market Size, Share and Trends Analysis Report. 2024, Grand View Research.
N. Bertram, S. Fuchs, J. Mischke, R. Palter, G. Strube, and J. Woetzel, Modular construction: From projects to products. 2019, McKinsey & Company.
L. Crawford, Senior management perceptions of project management competence. International Journal of Project Management. 23(1) (2005), pp. 7-16.
10.1016/j.ijproman.2004.06.005A.R.J. Dainty, M.I. Cheng, and D.R. Moore, A comparison of the behavioral competencies of client-focused and production-focused project managers in the construction sector. Project Management Journal. 36(2) (2005), pp. 39-48.
10.1177/875697280503600205M.I. Cheng, A.R.J. Dainty, and D.R. Moore, Implementing a new performance management system within a project-based organization: A case study. International Journal of Productivity and Performance Management. 56(1) (2007), pp. 60-75.
P.M. Podsakoff, S.B. MacKenzie, and N.P. Podsakoff, Sources of method bias in social science research and recommendations on how to control it. Annual Review of Psychology. 63 (2012), pp. 539-569.
10.1146/annurev-psych-120710-100452A.G.F. Gibb, Off-site Fabrication: Prefabrication, Pre-assembly and Modularisation. 1999, Whittles Publishing.
L. Jaillon and C.S. Poon, Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong. Automation in Construction. 39 (2014), pp. 195-202.
10.1016/j.autcon.2013.09.006L. Koskela, An exploration towards a production theory and its application to construction. 2000, VTT Publications 408.
A. Borrmann, M. Konig, C. Koch, and J. Beetz, Building Information Modeling: Technology Foundations and Industry Practice. 2018, Springer.
10.1007/978-3-319-92862-3M. Uhm, G. Lee, and B. Jeon, An analysis of BIM jobs and competencies based on the use of terms in the industry. Automation in Construction. 81 (2017), pp. 67-98.
10.1016/j.autcon.2017.06.002M. Grootendorst, BERTopic: Neural topic modeling with a class-based TF-IDF procedure. arXiv preprint arXiv:2203.05794. (2022).
L. McInnes, J. Healy, and J. Melville, UMAP: Uniform Manifold Approximation and Projection for dimension reduction. arXiv preprint arXiv:1802.03426. (2018).
10.21105/joss.00861R.J.G.B. Campello, D. Moulavi, and J. Sander, Density-based clustering based on hierarchical density estimates. In Advances in Knowledge Discovery and Data Mining (PAKDD 2013). Lecture Notes in Computer Science. 7819 (2013), pp. 160-172.
10.1007/978-3-642-37456-2_14M. Roder, A. Both, and A. Hinneburg, Exploring the space of topic coherence measures. In Proceedings of the 8th ACM International Conference on Web Search and Data Mining (WSDM). (2015), pp. 399-408.
10.1145/2684822.2685324C.C. Aggarwal, A. Hinneburg, and D.A. Keim, On the surprising behavior of distance metrics in high dimensional space. In Proceedings of the International Conference on Database Theory (ICDT), Lecture Notes in Computer Science. 1973 (2001), pp. 420-434.
M.B. Chrissis, M. Konrad, and S. Shrum, CMMI for Development: Guidelines for Process Integration and Product Improvement. 2011, Addison-Wesley.
M.C. Paulk, B. Curtis, M.B. Chrissis, and C.V. Weber, Capability maturity model for software. IEEE Software. 10(4) (1993), pp. 18-27.
10.21236/ADA263403B. Succar, W. Sher, and A. Williams, An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction. 35 (2013), pp. 174-189.
10.1016/j.autcon.2013.05.016W.W. Wu and Y.T. Lee, Developing global managers’ competencies using the fuzzy DEMATEL method. Expert Systems with Applications. 32(2) (2007), pp. 499-507.
10.1016/j.eswa.2005.12.005- Publisher :Sustainable Building Research Center (ERC) Innovative Durable Building and Infrastructure Research Center
- Publisher(Ko) :건설구조물 내구성혁신 연구센터
- Journal Title :International Journal of Sustainable Building Technology and Urban Development
- Volume : 17
- No :2
- Pages :366-387
- Received Date : 2026-06-04
- Accepted Date : 2026-06-15
- DOI :https://doi.org/10.22712/susb.20260021


International Journal of Sustainable Building Technology and Urban Development









